Cogela was commissioned by Loto Quebec and its subsidiary, Casiloc, to manage the entire construction project for the luxury Mont-Tremblant Casino, which is certified LEED Silver. This large-scale $55M initiative was an accelerated project, and far exceeded customer expectations.
Casino de Mont-Tremblant
Overview
Summary of achievements
- Construction of a 6,545m² LEED Silver building comprised of five above-ground levels featuring: 25 gaming tables, 400 slot machines, bar (with seating for 125 plus entertainment), 1 restaurant, and 1 “high roller” section.
- The investment for the project duration is over $55M
Features
- Due to an important change in program from the client side, the project took place over three years. Initially, the project was designed around the Ludoplex gaming hall concept. This concept was abandoned during construction to focus on a luxury casino concept
- Electromechanical control systems and high-performance lighting linked to acomputerized management system
- Complex and sophisticated architecture incorporating rich, refined materials
- LEED Silver certification to promote eco-friendly development, as well as the use of green materials and resources
- Project required coordinating 250 individuals and managing a schedule of some 500 activities
- Complex geometric steelroof
- Proven technical expertise—foundation blasting in confined spaces
- Structure located mid-mountain
- Project delivered on time and on budget
- Client recognition/mention during opening ceremony.
Project Sheet:
Project location: Versant Soleil Mont-Tremblant
Project carried out: 2006 to 2009
Contract provider: Casiloc, inc., subsidiary of Loto Québec
Type of contract: “fast track” management with redesign during construction
Architect: Menkes Shooner Dagenais Letourneux